Right on schedule for February 1st.
Pictures soon -batteries died, but I bought more, then I changed camera and those batteries died...
On the first floor -
- Kitchen done - needs floor cleaning and some scratch touch up
- Small room done - probably some spots to touch up after the floor is in
- Bathroom primed - ready to paint (tonight)
- Hall - Painted and chair rail up. Some detail work needed.
- Bedroom - half primed - the color is SOOOOO dark! Even under 2 coats of primer some of it looks dark
- Front door latch repaired
What's left
- Paint bathroom
- Finish priming bedroom -paint it
- Readhere bathtub surround
- Put laminate floor in small room
- Fix closet window. maybe throw some paint up in there.
- Clean everything