Tuesday

Downstairs update

Where we are now
The kitchen just needs the drawer fronts and last cabinets put up. 
Those 'white spots' are from the flash off the window.
I am sure there are some renegade paint spots to get off the floor as well.  
I think the top of the inside of the window needs a 2nd coat of paint, too. 

The living room is 1/2 painted, bedroom is 1/2 primed, small room is primed and bathroom is only 1/2 prepped for primer.
The rest of the chair rail needs to go up in the hall.
2+ days of SNOW slowed us down a lot, but getting  3 1/2 rooms painted should be pretty quick.
The wall color is darker than it seems, living room
The back wall is browner and darker than it looks here.

No comments:

Post a Comment